Electrotherm (India) Limited
Electrotherm (India) Limited
Engineering & Projects Steel Division Electric vehicle - YO Byke
Home Newsletter Sitemap Contact Us
Electrotherm (India) Limited
About Us About Us
Sponge Iron Sponge Iron
Billets Billets
Construction Steel Construction Steel
Stainless Steel Stainless Steel
D I  Pipes D I Pipes
 
-  Overview
-  Specifications
-  Manufacturing Process
-  Quality Standards
-  Applications
   
 
ET Home    |    Financials    |    R & D    |    News & Events    |    Careers    |    Enquiry    |    Distribution Network

Ductile Iron (DI) Pipes - Quality Standards

   
  Quality policy

Ductile Iron Pipe Division of Electrotherm India Limited aspires to protect our environment and enhance quality of life by
» Providing safe, strong and durable pipes for transport of water, gas and sewage
» Adopting processes which will add minimal pollutants to our environment
» Delivering desired quantities in time
» Reducing waste
» Motivating & training employees to bring out the best from them.

For continuous improvement, we rely on training, reduction of waste and effective utilization of resources.

Quality Assurance & Control DI Pipes

RAW MATERIAL
» Test certificates along with supply of repeated supplier
» Internal checking of composition as per QAP
INDUCTION FURNACE
» Weighing balance for raw material charging
» Immersion pyrometer for temperature checking
» Chemical Analysis from lab / spectrometer
LADLE TREATMENT / CONVERTER FOR "Mg" TREATMENT
» Temperature check by immersion pyrormeters
» Treatment checking for residual Mg at CCM
» Final sample for elements including residual Mg, nodule count, nodule distribution in as cast pipe
CASTING MACHINE
» Identification of chemical composition of last pipe produced and its structure
» Disposal of metal after the limit of fading effect
» Ensure that liquid metal is free from slag
» To control the temperature loss at hopper, ceramic blanket covered
» Machine parameters like RPM, machine down-speed, hopper speed controlled
» Addition of innoculants
» Application of Graphite wash for easy flow of liquid metal through the runner
» Core loader strength and spring compression check
» Load cell to measure the weight of each pipe and adjustment of wall thickness of pipe
GANTRY BEFORE ANNEALING FURNACE
» Check the thickness by pistol caliper
» Remove all sand from socket area before feeding in to the annealing furnace
» Visual inspection for other parameters
ANNEALING FURNACE
» Check and control the temperature of different zones by thermocouples
» check and control Furnace parameters like conveyer chain speed and temperature
» Bend and ovality test after annealing
SAMPLE CUTTING
» For mechanical testing and microstructure analysis
» Chamfering spigot area
» Check the parameters with GO / NO GO gauges
» Dimensional checking as per QAP
ZINC COATING
» Check and control machine parameters like trolley speed, RPM of pipe, wire feed rate, air pressure and power supply
» Check the mass of the zinc deposition on the pipe
GROOVE GRINDING
» Check and control / trimming of extra metal on socket area (for rubber gasket seal fixing)
HYDROSTATIC PRESSURE TESTING
» Each pipe for required pressure
» Check and control the flow of water as required
  Check and control hydraulic clamping pressure
CEMENT LINING
» Check the sand and cement quality as per specifications
» Check the cement, sand and water ratio
» Check the lining thickness
» Check the inner diameter after lining
CEMENT CURING
» Visual inspection after curing and clean lining surface if required
BITUMEN COATING
» Check and control machine parameters like trolley speed, RPM of pipe, air pressure and power supply
» Check the mass of the bitumen deposition on the pipe
» Check the coating thickness
FINAL INSPECTION & MARKING OF PIPES
» By stencils
Top

Certifications

» BUREAU OF INDIAN STANDARDS For manufacture of Centrifugally Cast (Spun) Ductile Iron Pressure Pipes for Water, Gas and Sewage as per IS : 8329-2000 in Class K-7 & K-9, spigot and socketed with push-on-joints, internal mortar (cement) lining and external zinc coating with finishing layer of bituminous paint.
» Management System as per DIN EN ISO 9001:2000 in accordance with TUV CERT procedures by TUV CERT Certification Body at TUV NORD CERT GmbH.


Registrations

» DIRECTORATE GENERAL OF SUPPLIES & DISPOSALS (DGS&D) – Shop floor inspection by DGS&D
» GUJARAT WATER SUPPLY & SEWERAGE BOARD (GWSSB) – Shop floor inspection by Certification Engineers International Ltd. (CEIL)
» MAHARASHTRA JEEVAN PRADHIKARAN (MJP) – Shop floor inspection by Iteng Engineering Pvt. Ltd., Mumbai.
» MUNICIPAL CORPORATION OF GREATER MUMBAI (MCGM) – Shop floor inspection by MCGM.
Ductile Iron Pipes
 
 
Steel Division / Ductile Iron (DI) Pipes / Quality Standards Home
Engineering & Projects Engineering & Projects
Steel Division Steel Division
Electric Vehicle - YoByke Electric Vehicle - Yo Byke
Distribution Network
Other Ventures Indus Institute of Technology & Engineering Ahmedabad Aviation & Aeronautics Limited Western India Institute of Aeronautics Mangalam Infotech Quick Contact:
+91-2717-234553, 234613, 660550