Electrotherm (India) Limited
Electrotherm (India) Limited
Engineering & Projects Steel Division Electric vehicle - YO Byke
Home Newsletter Sitemap Contact Us
Electrotherm (India) Limited
About Us About Us
Sponge Iron Sponge Iron
Billets Billets
Construction Steel Construction Steel
Stainless Steel Stainless Steel
D I  Pipes D I Pipes
 
-  Overview
-  Specifications
-  Manufacturing Process
-  Quality Standards
-  Applications
   
 
ET Home    |    Financials    |    R & D    |    News & Events    |    Careers    |    Enquiry    |    Distribution Network

Ductile Iron (DI) Pipes - Manufacturing Process

   
 
RAW MATERIAL
The major inputs like pig iron, cast iron, sponge iron are manufactured at the most modern composite iron and steel plant of Electrotherm situated in the same campus as the plant for manufacture of DI Pipes. The composite iron and steel plant of Electrotherm.
INDUCTION FURNACE
Melting done from solid charge for hot metal. Weighed, known charge is put to the furnace. Analysis of metal bath is done. Final adjustment of chemical composition is achieved by additives and chemical analysis done by spectrometer for trace and
MAGNESIUM TREATMENT IN LADLE / CONVERTER
Fixed quantity of liquid metal is tapped from furnace to open ladle at about 1550 deg (± 50) C already containing required quantity of FeSiMg lumps covered with metallic covering. Qty. of FeSiMg is governed by opening S % and liquid metal quantity
CENTRIFUGAL CASTING MACHINE
Slag is removed before casting. Pouring temperature as per QAP.
ANNEALING FURNACE
Ferritizing anneal heat treatment.
ZINC COATING
External surface coating is done by arc paint process. Melted zinc is deposited as fog by compressed air. Coating mass per meter square as per QAP.
FETTLING
Cleaning of socket / spigot ends from sand and other materials.
HYDROSTATIC PRESSURE TESING
Each and every pipe is hydrotested at specified pressure to ensure leak proof pipes as per QAP.
CEMENT LINING
Inside of bore is given a cement mortar lining of 3 to 5 mm thickness as per QAP.
STEAM CURING
Slow curing by steam ensures rigid lining.
BITUMEN COATING
External surface coating is done by spraying of bitumen. Coating mass per square meter as per QAP.
MARKING
By stencilling logo, size, class, year of manufacture and length.
STOCK YARD
The pipes are properly stacked in the stock yard.

Ductile Iron Pipes
 
 
Steel Division / Ductile Iron (DI) Pipes / Manufacturing Process Home
Engineering & Projects Engineering & Projects
Steel Division Steel Division
Electric Vehicle - YoByke Electric Vehicle - Yo Byke
Distribution Network
Other Ventures Indus Institute of Technology & Engineering Ahmedabad Aviation & Aeronautics Limited Western India Institute of Aeronautics Mangalam Infotech Quick Contact:
+91-2717-234553, 234613, 660550